Plannerly
Create
Log in
Sign up
Home
Feedback
Ideas
Changelog
Boards
Ideas
Powered by Canny
Ideas
Details
Showing
Under Review
Sort
Trending
Top
New
Filter
Under Review
Planned
In Design
In Progress
Complete
posts
ACC Docs file sync
We are using ACC Docs as our main CDE and it would be very beneficial if we could export and sync Plannerly's files in File Manager directly to a specific path/folder in ACC docs. This way when you update the document and export a new version ACC will automatically get updated.
3
·
under review
13
Print options for "Table Index" and "List of figures"
It would be very nice to get a hyperlinked "Table of Contents", "Table Index" and "List of figures" by printing the BEP as a pdf. These Tables must have (as a minimum) the page number and a formatted form.
6
·
under review
23
ACC Issues to Plannerly Tracking
Would like issues from ACC to be in Plannerly Track. That way tasks and issues can be tracked together.
5
·
under review
27
Track Team Members last login/access
The ability to see when a user (team members) last logged in to the project. In addition to tracking user activity, it would be beneficial to include user login activity within the project feed. This added visibility into when and how users are accessing the project can provide valuable data for analysis purposes.
1
·
under review
9
Sharepoint file sync
Syncing files between Sharepoint and the filtered folders in Plannerly's File Manager
3
·
under review
4
group model (IFC) tree view by objecttype
When connecting a model to the tasks you need to have the tree sorted by element types to assign PILES to piles tasks and DOORS to doors task. The direct attribute NAME is actually the human readable unique name of the element (essentially = GLOBALID) and the type should be in the attribute OBJECTTYPE. There could be an option to build the tree by any attribute.
2
·
under review
8
Choose another project from drop-down list
When I’m in a project, it would be easier to have an arrow in the top left corner that I could click on to go from a drop-down list to another project. Now a little bit complicated a project changing.
3
·
under review
9
Red Light/ Green Light for Checklists
We would like to see the checklist box show red (if unfinished - items remain) or green (all checked off). This way it will be clear when it's ready to move to the next milestone
2
·
under review
11
Link Docs + Scope to Building Connected
It would be great to have the docs and scope linked to Building Connected. So when we are going through the final pricing our subcontractors are seeing a draft of the BIMx plan when they are pricing.
1
·
under review
2
Ability to add/change parameter values in Verify
Provide access to certain properties, so users can fill them out in the online environment, which leads to a complete data model with supplier information added, ready for handover
2
·
under review
6
Load More
→
Powered by Canny